Helix
AL

DOHMH Compliance Wall

January 15 is the annual DOHMH filing deadline for every tank serving NYC buildings. The Compliance Clerk agent drafts filings from live service data; blocked filings escalate to the operations team; the seasonal war-room view activates October 1 each year.

Deadline Jan 15, 2027 · 273 days out3 blocked53% already filed
Filed
8
53%
Drafted
2
ready for review
Blocked
3
signatures / labs / access
Not started
2
scheduling owed

Blocked filings — escalation needed

Most common blocks: awaiting tenant/board signature, awaiting lab result, rooftop access

TK-0006
Citi Field
Inspector: David Kim, PE (PE-019922)
blocked: awaiting-lab
TK-0009
212 Fifth Ave
Inspector: Tomás Reyes (MP-44829)
blocked: awaiting-signature
TK-0010
91 Leonard
Inspector: Katherine Ng, PE (PE-028441)
blocked: access

All tanks — 2026 filing status

15 tracked

TK-0001
filed
Rockefeller Center
Tomás Reyes · MP-44829
TK-0002
filed
Empire State Building
Tomás Reyes · MP-44829
TK-0003
filed
Freedom Tower
Katherine Ng, PE · PE-028441
TK-0004
drafted
Chrysler Building
Tomás Reyes · MP-44829
TK-0005
filed
One Vanderbilt
Katherine Ng, PE · PE-028441
TK-0006
blocked-awaiting-lab
Citi Field
David Kim, PE · PE-019922
TK-0007
drafted
450 Lexington
Tomás Reyes · MP-44829
TK-0008
filed
340 Madison
Tomás Reyes · MP-44829
TK-0009
blocked-awaiting-signature
212 Fifth Ave
Tomás Reyes · MP-44829
TK-0010
blocked-access
91 Leonard
Katherine Ng, PE · PE-028441
TK-0011
not-started
420 Kent Ave
Tomás Reyes · MP-44829
TK-0012
filed
11 Hoyt
Katherine Ng, PE · PE-028441
TK-0013
not-started
LIC Plaza
Tomás Reyes · MP-44829
TK-0014
filed
Yankee Stadium Ops
David Kim, PE · PE-019922
TK-0015
filed
412 W 42nd St
Tomás Reyes · MP-44829